{"id":1027,"date":"2020-07-04T06:39:11","date_gmt":"2020-07-04T06:39:11","guid":{"rendered":"https:\/\/www.zillionsbuyer.com\/blog\/?p=1027"},"modified":"2020-07-04T06:39:24","modified_gmt":"2020-07-04T06:39:24","slug":"what-is-load-factor-also-explain-in-detail","status":"publish","type":"post","link":"https:\/\/www.zillionsbuyer.com\/blog\/what-is-load-factor-also-explain-in-detail\/","title":{"rendered":"What is Load Factor also explain in detail."},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"> 1)In electrical engineering the <em><a href=\"https:\/\/www.zillionsbuyer.com\/product\/4014\/standard-multi-meter-moving-type-hsn-9030\"><strong>load facto<\/strong>r<\/a><\/em> is defined as the average load divided by the peak load in a specified time period. The ratio of average load to maximum load is called the load factor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2)Load factor=Energy consumed during 24 hours \/Maximum demand x 24 hours<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"547\" height=\"248\" src=\"https:\/\/www.zillionsbuyer.com\/blog\/wp-content\/uploads\/2020\/07\/Load-Curve.jpg\" alt=\"\" class=\"wp-image-1028\" srcset=\"https:\/\/www.zillionsbuyer.com\/blog\/wp-content\/uploads\/2020\/07\/Load-Curve.jpg 547w, https:\/\/www.zillionsbuyer.com\/blog\/wp-content\/uploads\/2020\/07\/Load-Curve-300x136.jpg 300w\" sizes=\"auto, (max-width: 547px) 100vw, 547px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">3)The area under the load curve represents the energy consumption in kilo-watt-hours during the period. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4)The load factor can also be defined as the ratio of the energy consumed during a given period to the energy which would have been used if the maximum demand had been maintained throughout that period.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>1)In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. The ratio of average load to maximum load is called the load factor. 2)Load factor=Energy consumed during 24 hours \/Maximum demand x 24 hours 3)The area under the load curve represents the energy [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1028,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[44],"tags":[],"class_list":["post-1027","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-engineering"],"_links":{"self":[{"href":"https:\/\/www.zillionsbuyer.com\/blog\/wp-json\/wp\/v2\/posts\/1027","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zillionsbuyer.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zillionsbuyer.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zillionsbuyer.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zillionsbuyer.com\/blog\/wp-json\/wp\/v2\/comments?post=1027"}],"version-history":[{"count":1,"href":"https:\/\/www.zillionsbuyer.com\/blog\/wp-json\/wp\/v2\/posts\/1027\/revisions"}],"predecessor-version":[{"id":1029,"href":"https:\/\/www.zillionsbuyer.com\/blog\/wp-json\/wp\/v2\/posts\/1027\/revisions\/1029"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zillionsbuyer.com\/blog\/wp-json\/wp\/v2\/media\/1028"}],"wp:attachment":[{"href":"https:\/\/www.zillionsbuyer.com\/blog\/wp-json\/wp\/v2\/media?parent=1027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zillionsbuyer.com\/blog\/wp-json\/wp\/v2\/categories?post=1027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zillionsbuyer.com\/blog\/wp-json\/wp\/v2\/tags?post=1027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}